Progress report of the conservation action for marble trout
Work in progress and work completed as at 15/03/2015
• Intervention design and population breeding, introduction and monitoring plans. A technical document was drawn up according to schedule, to serve as the reference action plan;
• Construction drawings for the incubator have been issued and the relative contract has been awarded. Work is underway and the structure will be ready by the end of March;
• Eradication of the brown trout. 8 days of intervention have been completed since autumn 2014, resulting in the removal of 645 specimens (460 in the Campiglia torrent and 91 in Piantonetto1). The fish captured were transferred downstream of (natural or artificial) barriers so as to prevent the subsequent re-colonisation of the areas where the marble trout will be introduced.
Progress status of high-altitude aquatic habitat quality improvement actions (Actions C.4 and C.5)